How Long Does It Take to Build a Website? A Realistic Timeline

5 min read

How Long Does It Take to Build a Website? A Realistic Timeline

A professionally built website typically takes 4 to 6 weeks for a small brochure site, 8 to 12 weeks for a 10 to 20 page business site or a typical online store, and 12 to 24 weeks for a custom web application. Those are the usual ranges in Wapiti Digital's 2026 guide, and they match what most small businesses should plan for. The build itself is rarely what slows a project down. The biggest factors are how ready your content is, how quickly decisions and feedback come back, and how many systems the site has to connect to. Have your content and a single decision-maker lined up before you start, and you'll land at the short end of the range.

Typical timelines by type of site

Type of site Typical size Typical timeline
Brochure site 5–8 pages 4–6 weeks
Small business marketing site 10–20 pages 8–12 weeks
Ecommerce store Up to ~100 products 8–12 weeks
Custom web application (portals, booking, dashboards) Varies 12–24 weeks

These are US-wide 2026 ranges from Wapiti Digital's 2026 website cost and timeline guide. For what each of these typically costs, see our Kansas City website cost guide, which uses the same ranges.

A DIY site on Wix or Squarespace can go up in a weekend, if you already have your words and photos. A redesign of an existing site isn't automatically faster than a new one: moving content, keeping search rankings and redirecting old URLs all take time.

The phases, and how long each takes

Most projects follow the same steps. Wapiti Digital gives these typical durations:

Phase Typical time What happens
Discovery and planning 1–3 weeks Goals, audience, pages, features, integrations, sitemap
UX and visual design 2–6 weeks Layouts, design direction, revisions, approval
Development 4–12 weeks Building pages, features, forms, integrations, content entry
Testing and QA 1–4 weeks Devices, browsers, forms, speed, accessibility, fixes
Launch and handoff About 1 week Go live, redirects, analytics, training

Some of these overlap. Content can be written while design is underway, and development can start on approved templates while other pages are still being designed.

Discovery and planning (1 to 3 weeks)

This is where you decide what the site needs to do: which pages, which features, what it connects to, and how you'll measure whether it works. Skipping it doesn't save time. It moves the decisions into design and development, where changing them costs more. Our 10 questions to ask before launching a web project are a good way to prepare.

Design (2 to 6 weeks)

The range is wide because it depends mostly on revision rounds. A clear brand, a few sites you like, and one person who approves the design keep it short. A committee and no clear direction stretch it out.

Development (4 to 12 weeks)

Building the pages is usually predictable. What adds time is integrations (your CRM, booking system, inventory, ERP or payment processor), custom features, and moving content from an old site. Each integration depends on the other system's documentation, access and test accounts, so request those early.

Testing (1 to 4 weeks)

Check the site on phones, tablets and browsers; test every form and checkout path; check speed and accessibility; and fix what you find. Build testing time into the schedule rather than treating it as whatever's left before the launch date.

Launch (about a week)

Launch day itself is short. Around it: pointing the domain, setting up redirects from old URLs, adding analytics and Search Console, and training your team to update content.

After launch: search engines take time too

A new site or page doesn't appear in Google the moment it goes live. Google says crawling "can take anywhere from a few days to a few weeks" (Google Search Central). Submitting a sitemap in Search Console helps Google find your pages, and redirects from old URLs help a redesigned site keep the rankings it already has.

Ranking well for competitive searches takes longer still. Plan for months, not days, and keep adding useful content after launch.

What actually causes delays

In most projects, the delays aren't in the code. Wapiti Digital puts it this way: "Content readiness and feedback speed are the quiet forces that decide whether you launch on time." The common culprits:

  • Content isn't ready. Page copy, photos, team bios, product details and service descriptions are one of the most common hold-ups. If you're writing it yourself, start before the project does.
  • Slow feedback. A week waiting on design approval is a week added to the schedule.
  • Too many decision-makers. Conflicting feedback from several people leads to extra revision rounds.
  • Scope creep. "While we're at it, can we add…" Each addition is reasonable on its own; together they push the launch back.
  • Third-party access. Waiting on logins for the domain, hosting, CRM or payment account. Gather these at the start.
  • Large content migrations. Hundreds of pages or products to move, clean up and redirect.
  • Late legal or compliance review. Privacy policies, accessibility requirements or regulated content checked at the end instead of the start.

How to launch sooner without cutting corners

  1. Get your content together first, or budget for copywriting as part of the project.
  2. Name one decision-maker who can approve design and content.
  3. Agree on the scope in writing, and keep a "phase two" list for good ideas that come up along the way.
  4. Collect logins and access for your domain, hosting and connected systems in week one.
  5. Launch with what matters most. A focused first version that goes live sooner beats a perfect one that keeps slipping. Add features once real visitors are using it.
  6. Choose the right platform. WordPress, Shopify and modern frameworks each have different trade-offs in speed to launch and long-term flexibility. Our comparisons of WordPress vs. Next.js and WooCommerce vs. Shopify can help.

Questions to ask about any timeline

When a developer gives you a timeline, ask:

  • What does the schedule assume from us, and by when (content, feedback, access)?
  • How many design revision rounds are included?
  • What happens to the timeline if we add something mid-project?
  • How long is testing, and what does it cover?
  • What's included in the first weeks after launch?

Our guide to choosing a web development company has more questions worth asking. And plan for life after launch: see what website maintenance costs.

Website development from Prodjex

Prodjex is a Kansas City area web development company that has delivered more than 617 projects since 2017. Our web development services cover business websites, online stores and custom web applications, including the integrations with your CRM, booking, inventory or accounting systems that often take the most planning.

We'll give you a timeline based on your actual scope, tell you what we need from you and when, and flag anything likely to add time before it does.

Talk to us about your website. Tell us what you need it to do and when you'd like to launch, and we'll tell you whether that date is realistic.